Pod Global llc on LinkedIn

Where containerized data centers live

Flexibility in data center site location and size
provides the following benefits:

Inexpensive Power

  • $0.05/kW h or less
  • Bulk power availability: 20 MW+
  • PUE below 1.15 annually

Abundant Dark Fiber

  • Short and long haul dark fiber for lease/IRU
  • Aggressive rates for dark fiber
  • Very favorable and flexible terms and conditions

Lower Latency

  • Optimal locations for Peripheral TradingSM
  • Dedicated, redundant fiber to major exchanges and market data